Won the bid for Sinoma Overseas Iraq UQNCC3500TPD Self-contained Power Station & Oil Tank Installation Project. The scope of the contract includes the installation of electromechanical equipment, process piping installation, production/installation of non-standard components (including non-standard equipment), insulation installation engineering, water supply and drainage pipe network installation engineering, electrical engineering, steel structure, non-standard/non-standard equipment production and installation, etc.
Won the bid for the civil engineering and installation project of Sinoma's solid-state Saudi HCC power system grid-connected transformation project. The scope of the contract covers cable-related works from the main step-down station to the incoming cabinet of the owner-owned power station, including civil construction, steel structure installation, grounding, lighting, cable laying, wiring, etc.; corresponding panel and cabinet renovation, optical fiber laying and wiring of the kiln tail, raw material mill, and cement mill power room installation;SVG capacitor compensation cabinet, power room installation, ventilation, air conditioning installation, etc.