? ? ? ?The Sadazi project is affiliated to the engineering project of Tianjin Mining Engineering Co., Ltd. Xizang Branch. Our company is mainly responsible for the construction of limestone mines-mechanical and electrical equipment and steel structure installation projects.
The entire project is about 6 kilometers of steel structure integrated belt conveying corridors. The current number of people in the project reaches 110. Construction is underway in an intensive and orderly manner as planned. It is planned to start testing in mid-May. Now nearly half of the belt laying and bonding have been completed, all equipment in the crushing workshop has been installed in place, non-standard and steel structures have been made and installed, and electrical cables have been laid.