<
>
At 9:28 local time on June 22, 2019, with a gesture from the local lifting commander, the first cylinder of the rotary kiln of the Lamali2 #production line in Oravalia, Argentina, was slowly lifted. The lifting work of the rotary kiln was officially started. After more than two months of preparation, the general contractors Sinoma, Tianjin Jingxing, Tianjin Tianan, and local employees successfully lifted the lift that day.
?
?
