国产精品亚洲欧自偷片专区,精品无码一区二区三区电影桃花,国产一卡二卡三卡欧美,免费淫毛片在线观看,国产av二区久久久久久久,国产香蕉超碰在线观看,丁香亚洲综合激情啪啪综合

The demolition work of Saudi YAMAMA project was fully completed at the established node

scanning:67 author: from: time:2023-11-17 classify:project dynamics
The main time period for the demolition of the cement mill is October 7899, which is the time period with the highest temperature in Saudi Arabia, with the highest temperature reaching 48. Moreover, the cement mill is a closed workshop, and the workshop is extremely hot

The demolition work of the cement mill workshop of the Saudi YAMAMA project is the last node of our company's demolition work, and it is also the key and difficult point. The cement mill workshop is compact in design and is a fully enclosed workshop; all the equipment, structures and non-standard in the workshop need to be operated by hand chain hoists; especially the overall demolition of the large dust collector and cement mill is even more difficult.
The main time period for the demolition of the cement mill is July/August/September/October. This time period is the time period with the highest temperature in Saudi Arabia, with the highest temperature reaching 48 ° C. The cement mill is a closed workshop, and the workshop is even more scorching; Jingxing people chose to face difficulties in the face of difficulties, carried forward the spirit of not being afraid of hardship and tiredness, and worked together to complete the established node plan for the demolition of the cement mill safely and on schedule on the premise of preventing heatstroke and dust.

109 (1)?109 (2)

109 (3)?109 (4)

Contribution by Jin Hailong

德保县| 颍上县| 龙州县| 万全县| 汉寿县| 凉城县| 五家渠市| 阿克陶县| 濮阳市| 忻城县| 礼泉县| 泉州市| 黔江区| 马关县| 海门市| 芦溪县| 界首市| 金塔县| 辽源市| 莆田市| 宁化县| 离岛区| 夏津县| 武夷山市| 独山县| 旬阳县| 沧源| 昔阳县| 疏勒县| 荆州市| 吉林省| 柳江县| 嘉鱼县| 通辽市| 红安县| 临高县| 祁阳县| 蓝山县| 阳信县| 敦化市| 高清|